Skip to content
Carpentry Calculators

Search calculators

Your measurements

Units

Depth filled with concrete (above any gravel).

Actual size, e.g. 3 1/2 in for a 4×4. Enter 0 for a footing without a post.

How far the post sits into the concrete.

80 lb bag ≈ 0.60 ft³, 50 lb fast-setting ≈ 0.375. Check your bag.

Results update as you type. Lengths accept decimals or fractions (e.g. 7 3/4).

Results

Concrete to order (incl. waste)
—
Bags to buy
—
Concrete per hole
—
Exact total
—
To order (other unit)
—

Save to a project

Projects are saved in this browser on this device only. They aren't uploaded anywhere, and clearing your browser data deletes them.

Want your brand in front of people using the Post Hole & Footing Concrete Calculator? Sponsor this calculator

Worked example

Four fence posts in 10 in holes 36 in deep, with 4×4 posts (3 1/2 in) set 30 in into the concrete, 10% waste and 80 lb bags:

  1. Hole: π × 5² × 36 = 2,827 in³.
  2. Post in the concrete: 3.5 × 3.5 × 30 = 367.5 in³, so 2,460 in³ of concrete per hole.
  3. Four holes: 9,840 in³ = 5.69 ft³. With 10% waste: 6.26 ft³.
  4. Bags: 6.26 ÷ 0.60 = 10.4, rounded up to 11 bags.

How it works: the formula

  • Hole volume = π × (diameter ÷ 2)² × depth.
  • Post volume = post width² × depth in the concrete (square post).
  • Concrete per hole = hole − post. Total = per hole × number of holes.
  • To order = total × (1 + waste %); bags = ⌈to order ÷ yield per bag⌉.

Assumptions and limitations

  • Holes are straight-sided cylinders. Belled or flared bottoms and irregular holes take more.
  • The post is square and centred. Round posts take slightly less space than a square of the same width.
  • Gravel under the post isn't included. Measure the depth from the top of the gravel.
  • Hole depth and footing size for decks and structures must follow your local code and frost depth.

Tools for this job

We may earn a commission if you buy through these links, at no extra cost to you. As an Amazon Associate we earn from qualifying purchases. Read our affiliate disclosure

Frequently asked questions

How much concrete do I need for a fence post?

Work out the volume of the hole (π × radius² × depth), subtract the part of the post that sits in the concrete, and multiply by the number of posts. A 10 in hole 36 in deep, with a 4×4 post set 30 in into the concrete, takes about 1.4 cubic feet: a little over two 80 lb bags.

How deep should a post hole be?

A common rule is one third of the post’s height above ground, and below the frost line in cold climates. For a 6 ft fence, that’s at least 2 ft and often 3 ft. Deck posts and footings are set by your local code and frost depth.

How wide should a post hole be?

About three times the width of the post is typical: roughly 10–12 in (250–300 mm) for a 4×4. Footings for decks are sized from the load and your local code.

Should the post sit on gravel?

Many builders put 4–6 in (100–150 mm) of gravel in the bottom for drainage, then set the post on it. Enter the post’s depth in the concrete (hole depth minus the gravel) so it isn’t counted twice.

  • Construction estimating

    Concrete Slab Calculator

    Concrete volume for slabs, pads and rectangular footings, in yards, metres and bags.

  • Decks & fences

    Fence Calculator

    Posts, panels or rails and pickets for a straight fence, with gate openings.

  • Deck boards, joists, beams and screws for your deck size, with a waste allowance.